Vifor 1 Wind Farm, 192 MW – Pogoanele, Buzău County

Vifor 1 Wind Farm is a large-scale energy infrastructure project in Pogoanele, Buzău County, developed to increase renewable energy generation capacity.

Installed capacity: 192 MW
Client: VESTAS CEU ROMANIA SRL
In partnership with: Luca Prest SRL
Scope: Infrastructure for 30 wind turbines and associated access works.

Scope of work performed

Wind turbine foundations

The project included 30 foundations for Vestas wind turbines, built in accordance with the technical requirements and quality standards of the wind energy industry. The works included:

  • Site layout and site organisation;
  • General and specialist excavation;
  • Reinforcement and formwork in accordance with the technical design;
  • Structural concrete pouring and concrete quality control;
  • Finishing, protection and preparation for turbine installation.

Access bridges

Two access bridges were built to provide operational access. The works included:

  • Bridge foundations and substructures;
  • Reinforced concrete superstructures;
  • Drainage, protection and connections to service roads.

Project outcome

The infrastructure required to install and operate the wind farm was completed to high standards of safety and durability, making a significant contribution to the development of green energy generation in the region.

Vifor 1 Wind Farm, 192 MW – Pogoanele, Buzău County

Our mission is to provide clients with outstanding services, high-quality work and delivery within agreed deadlines.

Customer relations office

© 2026 All rights reserved. Website developed by CyberStudio, Cluj.

Scroll to top