Wind Farm Contractor in Romania
Planning a wind energy project in Romania? Consartfan is a wind farm construction company in Romania delivering turbine foundations, access roads, working platforms and electrical infrastructure. Tell us what you need to build, and let’s discuss the right construction scope for your site.
For developers, investors and project partners building in Romania.
Wind infrastructure. Everyday impact.
Behind every turbine are the foundations, roads and electrical infrastructure that make a wind project possible. The projects we help build in Romania represent more than megawatts: their potential electricity output can be expressed in the everyday needs of households.
of wind project capacity
Across the documented projects in which Consartfan has carried out or is carrying out construction works.
of modelled electricity per year
Potential annual output once all included projects are fully operational, using a 30% capacity factor.
household-equivalents per year
Equivalent to approximately 530,000 households using 200 kWh of electricity per month.
Illustrative annual equivalent, not measured generation. Includes completed and ongoing construction projects, modelled for a full operational year. Consartfan contributes construction and infrastructure works; the figures describe the wind farms’ potential output. See the project breakdown and calculation assumptions ↓
Wind Farm Construction in Romania
A wind project needs a construction partner who understands how foundations, site access and electrical infrastructure fit together. Consartfan carries out the civil and infrastructure works that turn an approved technical design into a buildable site.
As a wind farm construction company in Romania, we work with developers, investors and project partners to define the works required for each location. The agreed scope depends on the design, ground conditions, turbine requirements and construction programme.
Wind turbine foundations
Foundation works can include drilling, excavation, reinforcement and concrete pouring, in line with the approved engineering design. The foundation solution and construction method must suit the turbine loads and the site’s ground conditions.
Access roads and working platforms
We build the access roads and working platforms needed for wind farm construction. These works support equipment delivery, construction traffic and the site activities planned around each turbine position.
Electrical and civil infrastructure
Our scope includes cable networks, electrical substation construction and associated civil works. Interfaces with other contractors, equipment suppliers and the project team are defined for each contract. See our electrical substation projects.
Why Consartfan?
Wind Farm Projects in Romania
Explore wind farm projects featured in our portfolio, including Grivița, Pecineaga, Săcele and Vifor. The MW figures shown describe each wind farm’s capacity; each project page provides its own construction context.
From project capacity to household electricity
Each project is counted once. Frumușița–Vector is shown as one combined 90 MW development; the two distinct Pecineaga projects are listed separately.
| Wind project | Capacity | Household equivalents |
|---|---|---|
| Vifor 1 (Pogoanele) | 192 MW | 210,240 |
| Săcele | 49.8 MW | 54,531 |
| Pecineaga II | 48 MW | 52,560 |
| Grivița | 54 MW | 59,130 |
| Frumușița–Vector | 90 MW | 98,550 |
| Pecineaga Nord-Est | 48 MW | 52,560 |
| Total | 481.8 MW | 527,571 |
Annual electricity: 481.8 MW × 8,760 hours × 30% = 1,266,170.4 MWh (about 1.27 TWh).
Reference household: 200 kWh per month × 12 = 2,400 kWh, or 2.4 MWh per year.
Annual household equivalent: 1,266,170.4 MWh ÷ 2.4 MWh = 527,571 households, rounded to approximately 530,000.
The 200 kWh monthly consumption and 30% capacity factor are transparent modelling assumptions, not a measured Romanian household average or measured wind farm performance. Actual annual generation varies with wind conditions, turbine performance, availability, curtailment and electrical losses. This comparison does not imply continuous supply to specific homes.
The calculation covers the documented capacities of Vifor 1, Săcele, Pecineaga II, Grivița, Frumușița–Vector and Pecineaga Nord-Est. It includes both completed and ongoing construction projects, using a full future operational year for every project.
Capacity is the full wind farm capacity associated with the construction project, not capacity owned or operated by Consartfan. Our construction responsibilities differ by project and may be shared with other contractors.
Nalbant and other projects without a confirmed capacity for our documented project scope are excluded. Earlier projects listed as the founder’s professional experience before Consartfan was established are also excluded.
At the same 30% capacity factor, the portfolio’s annual electricity equivalent is approximately 703,000 households at 150 kWh/month, 528,000 at 200 kWh/month, or 422,000 at 250 kWh/month. These are alternative consumption scenarios, not different project totals.
Capacity sources: Consartfan project portfolio, 2025 project retrospective, and the linked Frumușița–Vector and Pecineaga Nord-Est project updates above. Capacity inventory reviewed on 27 October 2026.
Company Documentation
Review the company documents shown below. Our team can provide current copies and discuss the documentation required for your project or tender.
A clear starting point for your project
Choosing a wind farm contractor in Romania starts with a practical conversation about your site and the works you need. You do not need to have every detail ready to make an enquiry.
1. Share your project outline
Tell us the location, planned capacity or turbine count, current development stage and target construction period. Add the main work packages you want to discuss: foundations, roads, platforms, cable networks or substation works.
2. Clarify the construction scope
We discuss the available technical information, site conditions and the interfaces between our works and other project partners. This helps identify what must be included before a meaningful construction proposal can be prepared.
3. Agree the next steps
The proposal and programme are developed around the scope agreed for your project. If you are still assessing an investment in Romania, explain what information you have and what you need next. Meet Consartfan or start a project enquiry.
Frequently Asked Questions
Consartfan carries out infrastructure and construction works for wind farms, including wind turbine foundations, access roads, cable networks, electrical substations and civil works for energy projects.
Yes. We carry out drilling, reinforcement and concrete pouring for wind turbine foundations in accordance with the technical requirements of each project.
Yes. We carry out cable installation, energy infrastructure and electrical substation construction for renewable energy projects.
Consartfan can carry out industrial and wind farm construction projects in various regions of Romania, depending on project requirements.
Start with the project location in Romania, planned capacity or turbine count, project stage, expected timing and the construction works required. Available layouts, geotechnical information and technical specifications help define the scope. If these are not yet available, send a short project outline first.
Yes. International developers and investors can use the English enquiry form to discuss wind farm construction in Romania. Describe the project and the support you need so our team can clarify the relevant construction scope and next steps.
This page describes construction and infrastructure services. Turbine supply, turbine installation, design responsibilities, permits and other development services must be confirmed separately for the specific project. Do not assume they are included in a construction quotation unless stated in the agreed scope.
Let’s Talk About Your Wind Farm
Share your location in Romania, project stage and the works you need. A short outline is enough to start — our team will contact you to clarify the scope before preparing a proposal.
Prefer to talk first? Call +40 771 689 314 or email office@consartfan.ro.
Your details will be used to respond to this enquiry. Please read our Privacy Policy.