Vifor Wind Farm, 192 MW – Pogoanele, Buzău County
Vifor 1 Wind Farm is a large energy infrastructure project in Pogoanele, Buzău County, supporting renewable electricity generation.
- Installed capacity: 192 MW
- Client: VESTAS CEU ROMANIA SRL
- In collaboration with: Luca Prest SRL
- Scope: infrastructure for 30 wind turbines and associated access works
Wind Turbine Foundations
The project included 30 foundations for Vestas wind turbines, built to wind industry specifications and quality standards:
- Setting-out and site organisation;
- General and specialist excavation;
- Reinforcement and formwork to the technical design;
- Structural concrete casting and quality control;
- Finishing, protection and preparation for turbine installation.
Access Bridges
Two access bridges were built, including foundations, bridge infrastructure, reinforced concrete superstructures, drainage, protection works and connections to access roads.
Project Outcome
The infrastructure for wind farm installation and operation was completed to high standards of safety and durability, contributing to green energy generation in the region.