Vifor Wind Farm, 192 MW – Pogoanele, Buzău County

Vifor 1 Wind Farm is a large energy infrastructure project in Pogoanele, Buzău County, supporting renewable electricity generation.

  • Installed capacity: 192 MW
  • Client: VESTAS CEU ROMANIA SRL
  • In collaboration with: Luca Prest SRL
  • Scope: infrastructure for 30 wind turbines and associated access works
Wind Turbine Foundations

The project included 30 foundations for Vestas wind turbines, built to wind industry specifications and quality standards:

  • Setting-out and site organisation;
  • General and specialist excavation;
  • Reinforcement and formwork to the technical design;
  • Structural concrete casting and quality control;
  • Finishing, protection and preparation for turbine installation.
Access Bridges

Two access bridges were built, including foundations, bridge infrastructure, reinforced concrete superstructures, drainage, protection works and connections to access roads.

Project Outcome

The infrastructure for wind farm installation and operation was completed to high standards of safety and durability, contributing to green energy generation in the region.

Request a Tailored Quote

Complete the form with your project details and the Consartfan team will prepare a quote tailored to your technical requirements and budget. We provide professional solutions for industrial construction, foundations, concrete structures and infrastructure works.

Vifor Wind Farm, 192 MW

Our mission is to provide clients with outstanding services, high-quality work and delivery within agreed deadlines.

Customer relations office

© 2026 All rights reserved. Website developed by CyberStudio, Cluj.

Scroll to top